52-53 Build
17 June 2010
Plaster
11 June 2010
Plaster
Hessian/Burlap
10 June 2010
Preparing Plaster
Laths
Copper Window Surrounds
Copper Window Sill
09 June 2010
ESB Box
Door Sill
08 June 2010
Plasterboard on the Ceiling
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2010
(68)
►
December
(2)
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
▼
June
(10)
Plaster
Plaster
Hessian/Burlap
Preparing Plaster
Laths
Copper Window Surrounds
Copper Window Sill
ESB Box
Door Sill
Plasterboard on the Ceiling
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
►
2009
(97)
►
December
(8)
►
November
(11)
►
October
(21)
►
September
(31)
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)