52-53 Build

04 December 2010

Finished Exterior



Posted by Bruce Darrell at 10:21 PM 0 comments

03 December 2010

Straw-Lime Insulation in Floor



Posted by Bruce Darrell at 10:22 PM 1 comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ▼  2010 (68)
    • ▼  December (2)
      • Finished Exterior
      • Straw-Lime Insulation in Floor
    • ►  November (4)
      • Plastering Cob Walls
      • Finished Windows
      • Covering Heating Pipes with Concrete
      • Preparing Cob Walls for Plaster
    • ►  October (4)
      • Exposed Cob Walls With Heating Pipes
      • Insulating Projecting Pieces
      • Building Window Panels
      • Mixing Hemp-Lime Insulation
    • ►  September (10)
      • Window Frames
      • The Glass Arrives
      • Wall Heating Upstairs
      • Finishing the Cob
      • Spaces Starting to Form
      • Garlic
      • Exterior Views
      • Cob Walls Revealed
      • Wall Heating Pipes
      • Prototype Window
    • ►  August (8)
      • Cob in the Walls
      • Wiring and Plumbing
      • Insulation and Plasterboard
      • Space for a Future Chimney
      • Ready for the Plasterboard
      • Plasterboard on the Octagon
      • Plasterboard and Plumbing
      • Interior Ready for Plasterboard
    • ►  July (4)
      • Exterior Views
      • Removing Scaffolding
      • Projecting Pieces
      • Finishing the Plaster
    • ►  June (10)
      • Plaster
      • Plaster
      • Hessian/Burlap
      • Preparing Plaster
      • Laths
      • Copper Window Surrounds
      • Copper Window Sill
      • ESB Box
      • Door Sill
      • Plasterboard on the Ceiling
    • ►  April (3)
      • Laths for the Exterior Plaster
      • Window and Sill
      • Gutters
    • ►  March (11)
      • Fascias on and Ready for the Gutters
      • The Gales
      • Preparing for Fascias
      • Purchased Windows and Doors
      • Trimming the Flat Roof Eave
    • ►  February (8)
    • ►  January (4)
  • ►  2009 (97)
    • ►  December (8)
    • ►  November (11)
    • ►  October (21)
    • ►  September (31)
    • ►  August (25)
    • ►  July (1)

Labels

  • ground floor (27)
  • cellar (23)
  • foundations (21)
  • framing (21)
  • concrete block (16)
  • plastic (13)
  • wall (12)
  • excavation (11)
  • workshop (10)
  • OSB board (8)
  • timber (8)
  • concrete (7)
  • weather (7)
  • beams (6)
  • cross bracing (6)
  • floors (6)
  • formwork (6)
  • rebar (6)
  • wood (6)
  • wood slab (6)
  • joists (5)
  • post (5)
  • water (5)
  • windows (5)
  • first floor (4)
  • joist (4)
  • frame raising (3)
  • hemp lime (3)
  • rain (3)
  • services (3)
  • visitors (3)
  • water level (3)
  • backfill (2)
  • cutting (2)
  • fill (2)
  • interior (2)
  • lime (2)
  • load bearing (2)
  • pipes (2)
  • soil profile (2)
  • trailer (2)
  • Beth (1)
  • Wendy (1)
  • bolts (1)
  • bonfire (1)
  • cantilever (1)
  • celebration (1)
  • drawings (1)
  • floor (1)
  • heating (1)
  • hemp (1)
  • material (1)
  • octagon (1)
  • party wall (1)
  • pier (1)
  • plywood (1)
  • polytunnel (1)
  • roof (1)
  • soil test (1)
  • stair openings (1)
  • stones (1)
  • stud (1)
  • thermal mass (1)
  • tools (1)
  • wildlife (1)
  • window (1)