skip to main
|
skip to sidebar
52-53 Build
25 August 2010
Plasterboard on the Octagon
16 August 2010
Plasterboard and Plumbing
06 August 2010
Interior Ready for Plasterboard
17 July 2010
Exterior Views
16 July 2010
Removing Scaffolding
14 July 2010
Projecting Pieces
03 July 2010
Finishing the Plaster
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2010
(68)
▼
December
(2)
Finished Exterior
Straw-Lime Insulation in Floor
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
►
2009
(97)
►
December
(8)
►
November
(11)
►
October
(21)
►
September
(31)
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)