12 September 2009

Day 33 - more floor panels

Today was a beautiful day - almost too hot to work. As soon as we started working with wood a few days ago the weather became very dry, and is set to continue until late next week. We feel blessed!

It was a much more productive day, despite the fact that we were both having to leave the site by mid afternoon, and Bruce had to sort out and give a presentation to the members meeting after lunch. We also stopped to speak to 3 separate large tours that passed through the site as part of the Cloughjordan energy fair.


We did manage to finish the basic construction of 7 floor panels - the two of us eventually developed a very efficient process, and it felt as though we would have finished all of the panels if we had an uninterrupted run for the full day.


We ended up finishing early - by our standards, but made sure that the floor pannels were well covered to protect from dew and rain.

The base of the 2 houses is starting to take shape.

2 comments:

  1. All very exciting. Eoin's to get down there and see it in the flesh. Denise

    ReplyDelete
  2. Watching with avid interest. Hope the settled weather continues. Hope to get down there at Halloween in me chippie costume and I'll drive a few nails into them ghouls and goblins that have taken residence in the cellar. Great blog Bruce and as for that slacker you have with you skiving off at midday. The other half i.e. not Denise

    ReplyDelete