skip to main | skip to sidebar

52-53 Build

31 March 2010

Fascias on and Ready for the Gutters




Posted by Bruce Darrell at 10:47 AM No comments:

The Gales

Part of the roof was only tacked down, and then the gales began to blow from the North West ....
Posted by Bruce Darrell at 10:25 AM No comments:

26 March 2010

Preparing for Fascias



Posted by Bruce Darrell at 10:01 AM No comments:

24 March 2010

Purchased Windows and Doors




Posted by Bruce Darrell at 9:52 AM No comments:

16 March 2010

Trimming the Flat Roof Eave


Posted by Bruce Darrell at 9:48 AM No comments:

12 March 2010

Second Wall to the Terrace



Posted by Bruce Darrell at 9:44 AM No comments:

08 March 2010

Insulating the Roof of the Projections


Posted by Bruce Darrell at 9:36 AM No comments:

05 March 2010

Working on the Roof Edges


Posted by Bruce Darrell at 9:21 AM No comments:

04 March 2010

Metal on the Octagon Roof





Celebrating getting the roof on the houses!
Posted by Bruce Darrell at 9:17 AM No comments:

02 March 2010

Preparing the Octagon Roof


Posted by Bruce Darrell at 10:56 PM No comments:

Octagon Roof Insulated and Covered



Posted by Bruce Darrell at 9:11 AM No comments:
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ▼  2010 (68)
    • ►  December (2)
    • ►  November (4)
    • ►  October (4)
    • ►  September (10)
    • ►  August (8)
    • ►  July (4)
    • ►  June (10)
    • ►  April (3)
    • ▼  March (11)
      • Fascias on and Ready for the Gutters
      • The Gales
      • Preparing for Fascias
      • Purchased Windows and Doors
      • Trimming the Flat Roof Eave
      • Second Wall to the Terrace
      • Insulating the Roof of the Projections
      • Working on the Roof Edges
      • Metal on the Octagon Roof
      • Preparing the Octagon Roof
      • Octagon Roof Insulated and Covered
    • ►  February (8)
    • ►  January (4)
  • ►  2009 (97)
    • ►  December (8)
    • ►  November (11)
    • ►  October (21)
    • ►  September (31)
    • ►  August (25)
    • ►  July (1)

Labels

  • ground floor (27)
  • cellar (23)
  • foundations (21)
  • framing (21)
  • concrete block (16)
  • plastic (13)
  • wall (12)
  • excavation (11)
  • workshop (10)
  • OSB board (8)
  • timber (8)
  • concrete (7)
  • weather (7)
  • beams (6)
  • cross bracing (6)
  • floors (6)
  • formwork (6)
  • rebar (6)
  • wood (6)
  • wood slab (6)
  • joists (5)
  • post (5)
  • water (5)
  • windows (5)
  • first floor (4)
  • joist (4)
  • frame raising (3)
  • hemp lime (3)
  • rain (3)
  • services (3)
  • visitors (3)
  • water level (3)
  • backfill (2)
  • cutting (2)
  • fill (2)
  • interior (2)
  • lime (2)
  • load bearing (2)
  • pipes (2)
  • soil profile (2)
  • trailer (2)
  • Beth (1)
  • Wendy (1)
  • bolts (1)
  • bonfire (1)
  • cantilever (1)
  • celebration (1)
  • drawings (1)
  • floor (1)
  • heating (1)
  • hemp (1)
  • material (1)
  • octagon (1)
  • party wall (1)
  • pier (1)
  • plywood (1)
  • polytunnel (1)
  • roof (1)
  • soil test (1)
  • stair openings (1)
  • stones (1)
  • stud (1)
  • thermal mass (1)
  • tools (1)
  • wildlife (1)
  • window (1)