28 September 2009

Day 46 - continuing with the floor

We finished more than half of the floor sheeting, and the weather continues to work in our favor.

Opening left in the floor for access to the cellars.

The floor was designed so that all of the edges of the OSB board are supported by either joists or blocking, to which the board is glued and screwed.

26 September 2009

Day 45 - starting to put in the floor

Before the OSB boards (more eco version of the dreaded chip board) can be screwed and glued to the joists, the top surface had to be scrubbed with a wire brush, primarily to remove the lime, but it helps to roughen the wood so that the glue can form a stronger bond.



Aoife and Leontien wait patiently.

The new wood slab sitting on the perimeter piers - this one at the dividing line between the two houses. By gluing and screwing the top surface to the timber joist and beams, the entire surface will act as one ridged slab structure, capable of transfering all of the wind loads from the walls through to the central cellar. The surface of the board on the underside of the slab is not structurally necessary, but helps to form a solid insulated slab that is ventilated underneath.

We fixed about 25% of the floor today