We spent the day finishing putting the top plate into position and preparing for the joists.

We were also able to put the 4 beams into position. These two beams over the main space of Bruce and Morag's house are composed of 3 lengths of 225x44mm (9"x2") which will be drilled and bolted together. A similar beam runs over the back of Pat's workshop. these three beams continue the load bearing over the long cellar walls.
A longer beam was put in place over the Octagonal space in Pat and Wendy's house. Because the span is so big in this area, this beam is composed of 4 lengths of 225x44mm timber which will be bolted together. this was a heavy beam but the two of us (with the support of Aaron) were able to lift it into position by constructing ladder of supports up each of the posts for the beam to rest on.
This beam will also be braced at each end to further reduce the span to the 4m that our engineer recommended, so we left a notch out of the bottom of the beam so that the brace could be inserted later. Pat has a few lengths of ash poles which will be used as bracing 'in the round'.


Overall view of the completed framing with temporary external bracing still in place. The panels are 2.88m high (almost 10 feet), and with the thickness of the ground floor slab and the space underneath, the framing is quite high.
View of the octagon with Pat and Wendy's front door to the left.
The front of Bruce and Morag's house with kitchen window to the left, front door in the middle, and large window to the dining room to the right.
View across the front of Bruce and Morag's house towards the side wall of the kitchen. the framing is only the outside of structure of the wall. An another wall will be constructed inside the space, to create a cavity 40cm thick which will be filled with hemp/lime insulation. this will reduce the size of the rooms by 25cm at the external walls, but will also provide deep window openings.
The double thick party wall with two lines of studs and substantial cross bracing between them.
View across the front rooms of Pat and Wendy's house, looking towards the octagonal shaped sitting area (session space!) from the kitchen, with the front door to the right.
The long back wall of the two houses.
Overall view from the North-West showing Bruce and Morag's house in the foreground.
We started the day by raising the plastic in the corner in order to move the plywood that was covering the hole into the cellar (the sheet would have been in the way of some of the walls). We have planned that the walls would simply be placed on top of the plastic, leaving it undisturbed.
Only one section of the floor was wet, and it didn't seem to have soaked into the hemp/lime insulation below. The OSB board that we used is quite resistant to water, and the coat of varnish would have helped.
The first frame being moved from the pile. It took a while to figure out how best to move these large frames.
Everyone had the required high vis vests and safety helmets, though Pat was left with a non-standard riding helmet. Safety first!
The first frame being raised into position on the floor slab.
Bruce was about to hammer in the first nail (with a posed smile)!
The second frame goes in to form the first corner (which happens to be Bruce and Morag's kitchen) while Eoin measures out the line of the third frame. The frames were assembled in such a way that they supported each other as much as possible while the rest of them were assembled.
Everyone concentrates on the third frame.
The end of the house begins to take shape, as the fantastic weather dries out the floor at the other end of the house.
The heavy frames are moved with ease across the site when there are enough people. (John Burke's house in the background).
The first of the three sections of the party wall between the houses gets lifted into position. This was the largest and heaviest panel, as it was made of two frames nailed together.
A little persuasion to put the frame in place. "Sledge to the millimeter" was the motto of the day!
The main front wall of the house finished in time for lunch/tea break (as well as the camera battery wearing out from all of the photos that Morag took!)
The interior frames are different from the exterior frames, as the cross bracing needs to be flush with the studs. We though notching each stud would be difficult to do, but it ended up being quite straight forward with the use of a skill saw set to the right depth, a hammer to knock out the wood, and a chisel to clean up the base of the notch.
There were a few other unusual cases of cross bracing, such as the one in the photo above to strengthen the area over two interior doors.
We had to build a second stack for the frames, this time at the back of the site (on the left in the photo below), to hold all of the interior frames, and the ones for the back wall.
Today we worked on the interior load bearing walls, which are made out of 150x44mm (6"x2") - but didn't take any photos of our progress.
Today we worked finished the panels that compose the long back wall of the two houses. As this wall faces North-East, and away from the views, it is composed of much smaller windows, most of which will slot in between the studs - which are spaced at 600mm centers (2 foot centers) - as seen above
Today we finished the three sections of the party wall dividing the two houses. In fact these are 6 panels, combined in pairs by the internal cross bracing. The double wall - made out of 100x44mm framing rather than 150x44mm framing used on the exterior walls - will help with reducing sound transmission and increases the fire rating of the wall.
We decided against using a nail gun and have opted for the slower but stronger approach of hammer and nails.

This of course requires one of us to climb up onto the stack ...
We completed the panels for the south end of Pat and Wendy's house this morning. In the photo above we are lifting the section with the big double doors that lead into the kid's room.

The stack of wall panels is starting to build up into an impressive pile, and we are only just over half finished the exterior walls and we still have to finish the interior load bearing walls.
Once the first five frames were completed - those that make up the front wall of the houses - we brought them to the site and stored them on a rack in an almost vertical position.
Although some of the frames were big and heavy (as much as 170kg) the two of us were able to manage moving them.
After the explorations and decisions yesterday, we launched full gear into building the basic wall sections, with the help of Wendy and Beth.
Bruce and Pat working on the wall containing the big kitchen window in Pat and Wendy's house.
The frames were loaded onto a trailer as they were completed (in this case the two sections that will make up the front wall of Bruce and Morag's house). When the trailer is full - probably 5 frames - we will drive it into the site and where all the panels will eb stored until the big frame raising day.

This is our first frame - the section of wall at the north end of the west facing walls of the house, containing the main window into Bruce and Morag's kitchen. these frames will be framed out of 150x44 studs, lintels and top/base plates.
We finished all of the remaining small pieces of the flooring, and now the structural slab is complete.
We decided to varnish the surface of the OSB board in order to protect it in case some water came through the plastic. Also, there is a good chance that we will move in to the houses before they are finished, before the final hardwood flooring is in place, and the varnished OSB board will be a better floor in the interim.

We hope that this plastic will last until the roof is in place and plan to place the wall panels directly on top of the plastic. So we secured the edges with batons and covered the surface with pallets and sheets of wood to prevent the plastic from billowing up too much in the wind.