We spent the day finishing putting the top plate into position and preparing for the joists.


We rented a submersible pump to remove most of the water from the cellars and the pit outside the cellar walls - about 30-40 cm of water in total was pumped out very quickly.
We then layered heavy gauge plastic sheeting around the entire perimeter of the cellar, temporarily securing it to thie top bearing plate. This plastic overlapped the sheets that came up from the base - a 'poor man's tanking' which will probably keep out most of the water, we hope. If not we will have to rent that pump again!
The site is ready for back-filling all of the excavations.
As was the cellar. One of the houses had more water than the other - indicating that there was a leak somewhere. Hopefully the plastic lining will deal with that.

We used a few hoses to siphon the water from the perimeter excavations into main pit (which is almost 1m deeper. It was a slow process but we managed to get all 15 pits cleared of water before the concrete truck arrived in the afternoon.
Pat did a lot of work yesterday, and we continued today to build up the wall, completing the fourth course of seven (these photos were taken the following morning).
There has been a fair amount of rain lately, and we have had to scoop out water from the floor of the foundation in order to be able to work. The level of the water in the main pit on the outside of the cellar wall is just below the level of the concrete slab.