52-53 Build
07 January 2010
Side Eaves to Shed roof
04 January 2010
Roof Framing to Projections
02 January 2010
113
01 January 2010
112
A cold and misty afternoon, and the felt on the flat roof is covered by sheets of plastic (held down by lumber and nailed at the edges). This double layer will hopefully survive the wind and keep out the rain.
22 December 2009
109
18 December 2009
Day 108
16 December 2009
Day 106
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
▼
2010
(68)
▼
December
(2)
Finished Exterior
Straw-Lime Insulation in Floor
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
►
2009
(97)
►
December
(8)
►
November
(11)
►
October
(21)
►
September
(31)
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)