22 December 2009
109
18 December 2009
Day 108
16 December 2009
Day 106
15 December 2009
Day 105
14 December 2009
Day 104
12 December 2009
Day 102
08 December 2009
Day 98
01 December 2009
Day 94
29 November 2009
Day 92
28 November 2009
Day 91
27 November 2009
Day 90
26 November 2009
Day 89
25 November 2009
Day 88
23 November 2009
Day 86
Day 85
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2010
(68)
►
December
(2)
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
▼
2009
(97)
▼
December
(8)
109
Day 108
Day 106
Day 105
Day 104
Day 102
Day 98
Day 94
►
November
(11)
Day 92
Day 91
Day 90
Day 89
Day 88
Day 86
Day 85
►
October
(21)
►
September
(31)
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)