skip to main
|
skip to sidebar
52-53 Build
23 November 2009
Day 85
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2010
(68)
►
December
(2)
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
▼
2009
(97)
►
December
(8)
▼
November
(11)
Day 92
Day 91
Day 90
Day 89
Day 88
Day 86
Day 85
Day 82
Day 80
Day 76
Day 71 - starting the rest of the frames
►
October
(21)
►
September
(31)
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)
No comments:
Post a Comment