We took a weeks holiday, well most of a week, and came back to a dry wrapped ground floor and framing.
The stack of wood in the shed is significantly smaller, but a lot of framing to do yet.
We started to build the frames for the first and second floor, and managed to get five frames finished.
02 November 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment