We completed the excavation for the 15 posts at the perimeter of the buildings.

Each post is 60cm below subsoil grade, sitting on a pad 1m x 1m x .3m deep. These will have short piers of 3 hollow concrete blocks, filled with concrete.

Today we finished the difficult first course, and made good headway on the second course.