skip to main
|
skip to sidebar
52-53 Build
20 August 2009
Day 14 - solitary Pat
While I was in Dublin working on drawings of the wood framing for the engineer to approve, and to determine the amount of timber we need, Pat was working in the pit laying blocks by himself in the intermittent rain - not sure how he got on.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2010
(68)
►
December
(2)
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
▼
2009
(97)
►
December
(8)
►
November
(11)
►
October
(21)
►
September
(31)
▼
August
(25)
Day 21 - rebar in pad foundations
Day 20 - preparing pad foundations
Day 19 - the cellar is finished
Day 18 - almost done the cellar
Day 17 - above ground
Day 16 - lots of tours
Day 15 - more than half way done the blocks!
Day 14 - solitary Pat
Floor Framing Drawings
Day 13 - blocks and rain
Day 12 - cutting blocks
Day 11 - more blocks and excavation
Day 10 - more concrete blocks
Day 9 - starting the concrete block walls
Day 8 - concrete blocks
Day 7 - digging the post foundations
Day 6 - concrete
Day 6 - finished formwork
Day 5 - preparing for concrete
Wildlife on site
Day 4 - filling in the hole agin
Day 3 - main excavation complete
Day 1 - Continuing the Excavation
Day 2 - completing the excavation (almost)
Day 1 - Excavation of Main Cellar
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)
No comments:
Post a Comment