11 August 2009

Day 6 - finished formwork

A 6 am start this morning shows the work we finished in the dark last night - the two plastic sheets lining the pit. Unfortunately we had to slice the plastic to work it around the cross bracing of the formwork.


Two layers of mesh rebar in place, with. an additional 11 lengths of rebar was placed on the lower layer of mesh to add more strength to the slab over the softer patch in the centre of the dig.

The finished formwork ready for concrete.