View of the cellar trench from the S-E (Pat and Wendy's end). Excavation finally finished (after 4 hours on site waiting for and watching a guy dig for 1 hour)
View of the trench form the N-W (Bruce and Morag's end), showing the little notch to the left to cary the projected bathroom.
Needed to dig out a bit more in the middle. This will have to be filled with stone, before pouring concrete.
Some water on the floor of the trench, but not a lot. It can easily be scooped out with a bucket.
View of the trench form the N-W (Bruce and Morag's end), showing the little notch to the left to cary the projected bathroom.
Needed to dig out a bit more in the middle. This will have to be filled with stone, before pouring concrete.
Some water on the floor of the trench, but not a lot. It can easily be scooped out with a bucket.
No comments:
Post a Comment