09 August 2009
Day 4 - filling in the hole agin
Water soaked into the low parts of the excavation overnight, a lot of which we hauled out of the excavation with buckets.
The two low areas were then filled with rocks gathered from around the site, to provide a more stable base and to reduce the volume of concrete needed.