skip to main
|
skip to sidebar
52-53 Build
22 September 2009
Day 41 - dealing with water
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2010
(68)
►
December
(2)
►
November
(4)
►
October
(4)
►
September
(10)
►
August
(8)
►
July
(4)
►
June
(10)
►
April
(3)
►
March
(11)
►
February
(8)
►
January
(4)
▼
2009
(97)
►
December
(8)
►
November
(11)
►
October
(21)
▼
September
(31)
Day 48 - floor slab finished, varnished and covered
Day 47 - almost finished the floor slab
Day 46 - continuing with the floor
Day 45 - starting to put in the floor
Day 44 - finished the hemp and lime insulation
Day 43 - and more hemp/lime
Day 42 - large quantities of hemp/lime insulation
Day 41 - first mix of hemp/lime insulation
Day 41 - dealing with water
Day 40 - starting the plumbing
Day 39 - bolting down the floor
Day 38 - finishing the odd pieces of structure and...
Day 37 - ground floor structure almost finished
Day 36 - more ground floor
Day 35 - putting the floor in position
Bonfire
Day 34 - preparing for the ground floor
Day 33 - more floor panels
Day 32 - starting the floor
Day 31 - setting the beams
conneting to the district heating ssytem
Day 30 - out of the ground and into wood
Day 29 - water and plastic
Day 28 - post beehives
Day 27 - post collars
Day 26 - posts
Day 25 - more concrete
Flooding
Day 24 - wood delivery
Day 23 - pier foundations
Day 22 - planning
►
August
(25)
►
July
(1)
Labels
ground floor
(27)
cellar
(23)
foundations
(21)
framing
(21)
concrete block
(16)
plastic
(13)
wall
(12)
excavation
(11)
workshop
(10)
OSB board
(8)
timber
(8)
concrete
(7)
weather
(7)
beams
(6)
cross bracing
(6)
floors
(6)
formwork
(6)
rebar
(6)
wood
(6)
wood slab
(6)
joists
(5)
post
(5)
water
(5)
windows
(5)
first floor
(4)
joist
(4)
frame raising
(3)
hemp lime
(3)
rain
(3)
services
(3)
visitors
(3)
water level
(3)
backfill
(2)
cutting
(2)
fill
(2)
interior
(2)
lime
(2)
load bearing
(2)
pipes
(2)
soil profile
(2)
trailer
(2)
Beth
(1)
Wendy
(1)
bolts
(1)
bonfire
(1)
cantilever
(1)
celebration
(1)
drawings
(1)
floor
(1)
heating
(1)
hemp
(1)
material
(1)
octagon
(1)
party wall
(1)
pier
(1)
plywood
(1)
polytunnel
(1)
roof
(1)
soil test
(1)
stair openings
(1)
stones
(1)
stud
(1)
thermal mass
(1)
tools
(1)
wildlife
(1)
window
(1)
No comments:
Post a Comment