We almost finished the ground floor slab today.
All that is left are a few small pieces to finish around the octagon.
Holes were cut in the boards to allow for all of the waste water pipes, the heating system pipes, and the water supply pipes. What we ended up with is a wooden version of the concrete slabs with pipes sticking out of them, which a lot of the other houses have.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment